New Driveway (August 2013) ::: << Prev ::: Thumbs ::: Next >> :::  
Click to see next picture
68 of 73. Because we have underground utilities, cable companies either tunnel under or cut driveways to install or repair existing lines. To avoid this in the future, I had the workers install a 20' length of 3" ID schedule 40 conduit with end caps at the end of our drive.