New Driveway (August 2013) | ::: << Prev ::: Thumbs ::: Next >> ::: | ||
68 of 73. Because we have underground utilities, cable companies either tunnel under or cut driveways to install or repair existing lines. To avoid this in the future, I had the workers install a 20' length of 3" ID schedule 40 conduit with end caps at the end of our drive. | |||